1 00:00:00,700 --> 00:00:24,609 [Music] 2 00:00:29,210 --> 00:00:27,380 the fourth upgraded Saturn one lost 3 00:00:30,550 --> 00:00:29,220 vehicle was ready for launch early 4 00:00:33,380 --> 00:00:30,560 during the fourth quarter 5 00:00:35,979 --> 00:00:33,390 however toward the end of July check out 6 00:00:37,970 --> 00:00:35,989 at KSC of lunar module components 7 00:00:41,060 --> 00:00:37,980 indicated there were problems with the 8 00:00:42,619 --> 00:00:41,070 LEM ascent and descent stages during 9 00:00:44,330 --> 00:00:42,629 August it became apparent that these 10 00:00:46,760 --> 00:00:44,340 problems would necessitate further 11 00:00:49,790 --> 00:00:46,770 testing and possible replacement of 12 00:00:51,470 --> 00:00:49,800 components by the end of the quarter it 13 00:00:53,959 --> 00:00:51,480 was definite that these problems were 14 00:00:56,180 --> 00:00:53,969 serious enough to warrant rescheduling 15 00:01:04,609 --> 00:00:56,190 of the 204 launch until the first 16 00:01:06,800 --> 00:01:04,619 quarter of 1968 the remaining uprated 17 00:01:08,810 --> 00:01:06,810 Saturn flight boosters were on or ahead 18 00:01:14,480 --> 00:01:08,820 of schedule at the end of the quarter 19 00:01:16,940 --> 00:01:14,490 September 1967 s 1 b5 was removed from 20 00:01:19,999 --> 00:01:16,950 storage in late August and refurbishment 21 00:01:23,660 --> 00:01:20,009 was begun at the end of the quarter this 22 00:01:25,460 --> 00:01:23,670 was 75% complete however due to the 23 00:01:28,070 --> 00:01:25,470 anticipated slip in the command service 24 00:01:32,950 --> 00:01:28,080 module delivery it is planned to 25 00:01:40,130 --> 00:01:37,640 s 1b 6 7 8 9 and 10 stages were in 26 00:01:47,899 --> 00:01:40,140 storage at Chrysler masu at the end of 27 00:01:52,940 --> 00:01:50,359 s1b eleven was in pre static check out 28 00:01:54,679 --> 00:01:52,950 during September and at the end of the 29 00:01:57,620 --> 00:01:54,689 quarter was moved to the preparation to 30 00:02:01,160 --> 00:01:57,630 ship area this stage will be shipped to 31 00:02:08,120 --> 00:02:01,170 MSFC during the next quarter or static 32 00:02:10,790 --> 00:02:08,130 firing tests s1 b12 was in final 33 00:02:13,160 --> 00:02:10,800 assembly during this period work was 34 00:02:16,040 --> 00:02:13,170 progressing satisfactorily and at the 35 00:02:20,990 --> 00:02:16,050 end of September all h1 engines had been 36 00:02:23,960 --> 00:02:21,000 installed work on s1 beast ages 13 37 00:02:26,570 --> 00:02:23,970 through 16 included long lead time 38 00:02:33,410 --> 00:02:26,580 procurement activity as well as part and 39 00:02:35,330 --> 00:02:33,420 component fabrication the s4 B stages 40 00:02:40,370 --> 00:02:35,340 for the remaining up rated Saturn one 41 00:02:43,940 --> 00:02:40,380 vehicles were on or ahead of schedule s4 42 00:02:46,009 --> 00:02:43,950 b stages 205 and 206 were removed from 43 00:02:47,960 --> 00:02:46,019 storage at McDonnell Douglas Sacramento 44 00:02:52,789 --> 00:02:47,970 test centers and are undergoing 45 00:02:57,319 --> 00:02:52,799 modifications and refurbishment stages 46 00:03:03,309 --> 00:02:57,329 s4 b 207 208 and 209 are presently in 47 00:03:09,199 --> 00:03:06,710 s4 b stage 210 was placed in temporary 48 00:03:11,090 --> 00:03:09,209 storage in tower number 7 at the 49 00:03:14,830 --> 00:03:11,100 mcdonnell-douglas space system center 50 00:03:18,860 --> 00:03:14,840 following completion of factory checkout 51 00:03:21,259 --> 00:03:18,870 the s4 b stage 211 is awaiting shipment 52 00:03:26,270 --> 00:03:21,269 to sacramento test centers for static 53 00:03:29,120 --> 00:03:26,280 firing in mid-september s4 b 212 a 54 00:03:31,069 --> 00:03:29,130 potential orbital workshop was removed 55 00:03:33,620 --> 00:03:31,079 from tower number 6 following completion 56 00:03:37,039 --> 00:03:33,630 of factory checkout and placed in 57 00:03:39,050 --> 00:03:37,049 storage at the space system center this 58 00:03:41,629 --> 00:03:39,060 stage will be returned to the insulation 59 00:03:49,580 --> 00:03:41,639 chamber for installation of a foil liner 60 00:03:53,210 --> 00:03:49,590 and high emissivity coating at the end 61 00:03:54,890 --> 00:03:53,220 of September 1967 status and progress of 62 00:03:59,990 --> 00:03:54,900 the remaining upgraded Saturn one 63 00:04:01,730 --> 00:04:00,000 instrument units were as follows in 64 00:04:05,000 --> 00:04:01,740 early September I you too 65 00:04:07,360 --> 00:04:05,010 at IBM Huntsville was removed from 66 00:04:10,160 --> 00:04:07,370 storage and modifications started 67 00:04:12,290 --> 00:04:10,170 however due to rescheduling the unit was 68 00:04:15,170 --> 00:04:12,300 returned to storage before modification 69 00:04:17,450 --> 00:04:15,180 was completed and work on 206 70 00:04:19,550 --> 00:04:17,460 modifications was initiated in late 71 00:04:26,750 --> 00:04:19,560 September and is scheduled for 72 00:04:29,870 --> 00:04:26,760 completion in mid-november iu 207 and 73 00:04:37,130 --> 00:04:29,880 208 are presently in storage at IBM 74 00:04:39,590 --> 00:04:37,140 Huntsville I you 209 was in check out 75 00:04:41,480 --> 00:04:39,600 and systems testing this unit is 76 00:04:45,380 --> 00:04:41,490 scheduled for completion of these tests 77 00:04:47,540 --> 00:04:45,390 in the next quarter installation of 78 00:04:51,140 --> 00:04:47,550 components in I you to 10 is 79 00:04:53,990 --> 00:04:51,150 approximately 70% complete and work is 80 00:04:58,150 --> 00:04:54,000 progressing satisfactorily completion of 81 00:05:04,130 --> 00:05:01,610 fabrication of SIU 211 was started this 82 00:05:09,280 --> 00:05:04,140 quarter at the end of the report period 83 00:05:14,060 --> 00:05:11,570 component parts for instrument unit 84 00:05:16,210 --> 00:05:14,070 number to 12 are currently being 85 00:05:18,740 --> 00:05:16,220 received 86 00:05:21,700 --> 00:05:18,750 other notable activities during the 87 00:05:24,560 --> 00:05:21,710 period of July through September 1967 88 00:05:26,920 --> 00:05:24,570 included a review of storage aspects of 89 00:05:28,930 --> 00:05:26,930 up rated Saturn one stage components 90 00:05:32,180 --> 00:05:28,940 astronaut briefings at manufacturing 91 00:05:36,770 --> 00:05:32,190 locations and continuing orbital 92 00:05:38,810 --> 00:05:36,780 workshop activities a necessary 93 00:05:41,810 --> 00:05:38,820 requirement in the upgraded Saturn one 94 00:05:45,020 --> 00:05:41,820 program is storage these requirements 95 00:05:46,850 --> 00:05:45,030 were anticipated and stage contractors 96 00:05:49,010 --> 00:05:46,860 were directed to make studies of storage 97 00:05:52,970 --> 00:05:49,020 requirements for periods of up to 24 98 00:05:54,710 --> 00:05:52,980 months however due to program delays it 99 00:05:56,840 --> 00:05:54,720 is now apparent that storage of many 100 00:06:00,290 --> 00:05:56,850 stages beyond 24 months will be 101 00:06:02,780 --> 00:06:00,300 necessary therefore the upgraded Saturn 102 00:06:05,330 --> 00:06:02,790 1 program office has initiated long-term 103 00:06:07,250 --> 00:06:05,340 storage plans who provide the best means 104 00:06:10,250 --> 00:06:07,260 of protection of flight Hardware for 105 00:06:12,380 --> 00:06:10,260 extended periods a target date for 106 00:06:15,320 --> 00:06:12,390 completion and implementation of these 107 00:06:23,420 --> 00:06:15,330 plans has been established as the 108 00:06:25,429 --> 00:06:23,430 of the next quarter the crime astronauts 109 00:06:27,529 --> 00:06:25,439 true and the backup crew for the first 110 00:06:30,110 --> 00:06:27,539 manned flight of the upgraded Saturn one 111 00:06:34,459 --> 00:06:30,120 made working tours of two production 112 00:06:37,399 --> 00:06:34,469 centers during the quarter on July 15th 113 00:06:40,719 --> 00:06:37,409 these astronauts and MSC and MSFC 114 00:06:46,369 --> 00:06:40,729 personnel visited the moshu facility and 115 00:06:48,589 --> 00:06:46,379 inspected s1 b5 and other Hardware on 116 00:06:51,350 --> 00:06:48,599 August 15th they made a working tour of 117 00:06:53,089 --> 00:06:51,360 the s4 B activities the group is 118 00:06:56,779 --> 00:06:53,099 scheduled to visit IBM Huntsville 119 00:07:04,070 --> 00:06:56,789 operations and MSFC early in the next 120 00:07:07,100 --> 00:07:04,080 quarter activity on the orbital workshop 121 00:07:09,649 --> 00:07:07,110 aspects of the s4 B stage is increasing 122 00:07:11,689 --> 00:07:09,659 each report period although actual 123 00:07:13,749 --> 00:07:11,699 production phases are not scheduled 124 00:07:16,040 --> 00:07:13,759 until two or three quarters from now 125 00:07:18,350 --> 00:07:16,050 final design Studies on the launch 126 00:07:22,519 --> 00:07:18,360 vehicle modifications are presently 127 00:07:24,800 --> 00:07:22,529 nearing completion orbital workshop 128 00:07:27,019 --> 00:07:24,810 activity during this period included 129 00:07:29,269 --> 00:07:27,029 study of liner material insulation and 130 00:07:33,950 --> 00:07:29,279 high thermal emissivity coating 131 00:07:35,689 --> 00:07:33,960 application developmental testing of 132 00:07:37,999 --> 00:07:35,699 floor grid structure was also 133 00:07:40,399 --> 00:07:38,009 accomplished the objectives of these 134 00:07:42,950 --> 00:07:40,409 tests were to determine strength and 135 00:07:46,869 --> 00:07:42,960 deflection capabilities as related to 136 00:07:50,329 --> 00:07:46,879 the fluid dynamics during stage burn 137 00:07:54,499 --> 00:07:50,339 also developmental testing of wall grid 138 00:07:56,420 --> 00:07:54,509 specimens was accomplished late during 139 00:07:58,309 --> 00:07:56,430 the quarter the s4b orbital workshop 140 00:08:00,769 --> 00:07:58,319 mock-up was shipped the McDonnell 141 00:08:03,680 --> 00:08:00,779 Douglas from MSFC for design 142 00:08:06,860 --> 00:08:03,690 modifications updating the mock-up is 143 00:08:08,629 --> 00:08:06,870 scheduled for return to MSFC late in the 144 00:08:13,610 --> 00:08:08,639 next quarter for further design 145 00:08:15,379 --> 00:08:13,620 evaluation due to delays experienced 146 00:08:18,260 --> 00:08:15,389 with the LEM payload during the quarter 147 00:08:19,790 --> 00:08:18,270 the launch of a s 204 has been 148 00:08:23,059 --> 00:08:19,800 rescheduled for early in the first 149 00:08:24,879 --> 00:08:23,069 quarter of 1968 because of design 150 00:08:28,910 --> 00:08:24,889 changes to the command service module 151 00:08:32,030 --> 00:08:28,920 the first manned Apollo launch is 2:05 152 00:08:34,790 --> 00:08:32,040 has been delayed until later in 1968 at 153 00:08:36,590 --> 00:08:34,800 the close of this quarter a plan was 154 00:08:39,440 --> 00:08:36,600 under study to launch a second lunar 155 00:08:43,049 --> 00:08:39,450 module development mission AAS 206